Inspiring Boating Stories & Travel fun from the Great Lakes and beyond!
Along with travel posts, I also share boat repairs and upgrades, tips and hints.
* Disclosure: As an Amazon Associate I earn from qualifying purchases via links.
Saturday, March 29, 2008
New Roof Overhang
Today we got to finish up the roof overhang on the river side of our slips. Things are starting tio shape up nicely at the cottage these days, with the installation of the metal brakets (a couple of weeks back) & the main beam sections to be installed tomorrow for our HUGE deck we is constructing. Anchor Girl was nice enough (again) to bring the hard working crew fresh coffee & Tim Bits all the way from The Wick. A little later on, Debbie & Pat showed up, too. There was actually quite a few folks visiting their vessels up there today, with the beautiful sunshine we had. Met a few more of the locals & gave everyone fair warning about the Crazy Keswickians. From what we seen so far, this season is gonna be a HOOT!!!
Today we also cut out the opening that's on the land side of Boogaboo's slip. Here's a pic of that big deal. That's where the new deck is going to go to. Or more :-)
Saturday, March 22, 2008
Roof Over Woubled Waters
The Boys headed off to The Cottage today to do some more improvements. This time it was a roof extension over 4 of our slips. As things was, the water side of the roof has some nasty rust lines on it, which, if our boats hang out too far, transfer themselves onto the swim platform, etc.. So, the 2' we added today will alleviate that concern.
Here we are, hard at it. Or, ah, Von Brauweiller appears to be hard at something else. Remind you of this years' FFF?
Saturday, March 15, 2008
If I Had Money
Saturday, March 1, 2008
The Good Old Days - These Are Those Days!
Let's make the most of it folks! Before we know it, we're looking back on 'the good old days'. Guess what? These are the good old days!
Again, Anchor Girl & I are sooooooooooooooooo looking forward to the upcoming season on the water!!! Actually, I'm hoping the relaunch clock slows down for a bit, as I'm wrapping up a number of pre-launch projects. Amongst them is replacing the the lower unit on one of my out drives (heading to Orillia this weekend to pick up the replacement - thanks for heads up on that one, Commander), bottom painting, building a roof extension at the front of three slips (before the ice goes out) at the cottage & finishing the brackets I'm fabricating for our new deck. Phew, I'm gonna really enjoy some hang time once the boat gets back in the water. . . And the new cottage deck is finished. . . And the inverter & vhf radio are installed. . . And the carpet is redone in Boogaboo's cabin. . . And the carpet, electrical receptacle & lights are installed on the dock. . . And the new opening is built behind our slip.
Hmmmmm, what am I forgetting?? Fear not, A. G. is sure to think of something . . . Oh well, it's all good.